The SANFL Talent & Community Centre was developed as a high-quality facility to support youth talent development and community engagement through sport. As part of the construction process, a key requirement was delivering a fast-track flooring solution while ensuring long-term performance of the concrete slab beneath. The project team applied DEEPBARRIER underfloor as both the curing agent and a permanent internal moisture barrier during the early construction phase.
This strategic move was driven by the need to accelerate construction timelines while maintaining full compliance with Australian standards for concrete curing and moisture control.
Installing floor coverings too early on green concrete often leads to long-term issues like adhesive failure, moisture damage, or flooring delamination. The challenge on this project was twofold:
Provide a curing solution that complied with AS 3799 standards
Enable the direct stick installation of flooring within 14 days of pour, without risking failure
The project needed a fast, compliant solution that wouldn’t compromise the performance or lifespan of the flooring.
DEEPBARRIER was applied immediately after the concrete pour to serve as both a compliant curing compound and a permanent internal moisture barrier. This eliminated the need for surface-applied moisture control systems later in the build and allowed the slab to reach optimal conditions for early flooring installation.
Key advantages included:
AS 3799 compliant moisture retention for proper curing
Deep penetration, permanently reducing moisture vapour transmission
No residue or surface film, allowing for direct stick flooring within 14 days
One-time application with no further preparation or treatment needed
The product was applied efficiently and integrated into the workflow with no delays.
The use of DEEPBARRIER underfloor delivered a high-performance result for both the builder and the flooring contractor:
Achieved full AS 3799 compliant curing without delaying project timelines
Allowed direct stick flooring installation within 14 days of the slab being poured
Eliminated the need for additional surface moisture barriers or grinding
Prevented long-term moisture-related flooring issues
Simplified construction sequencing and reduced costs
Delivered a smooth, clean slab ready for finishing without additional prep
Very satisfied contractor and client, with the project completed on time and to spec
The SANFL Talent & Community Centre now benefits from a moisture-safe slab and a flawless flooring installation — a great example of how early decisions on concrete treatment can drive better outcomes across the entire build